CASE STUDY: Shell Malaysia Forecourt Fit Out Program

CASE STUDY: Shell Malaysia Forecourt Fit Out Program

Check out our latest case study describing how Shell Malaysia saved time, money and the planet using IOBAC Express Cure resin for their refit programme of 20 forecourt shops. By going directly over the existing ceramic floor with IOBAC resin, then installing magnetic...
In the News: Ezy-Install in CFA Guide to Sustainability

In the News: Ezy-Install in CFA Guide to Sustainability

The Contract Flooring Association publish an annual guide to sustainability in flooring.  Described as “the flooring industry’s definitive source for the latest information about sustainability”, the 2021/22 guide features and article from our...
Case Study: Sustainable Workplace Chooses IOBAC Adhesive-Free Flooring

Case Study: Sustainable Workplace Chooses IOBAC Adhesive-Free Flooring

  When a 1,500m2 area within its prestigious London office headquarters was due to be refurbished, this sustainability-conscious client and architect specified adhesive-free flooring from IOBAC. Loughton Contracts Plc chose IOBAC MagTabs as the ideal solution to...