Check out our latest case study describing how Shell Malaysia saved time, money and the planet using IOBAC Express Cure resin for their refit programme of 20 forecourt shops.
By going directly over the existing ceramic floor with IOBAC resin, then installing magnetic stone-look Luxury Vinyl Tiles, project duration was slashed from 8 to 5 days.
Plus 135m2 landfill waste was prevented per shop!
Read all the details, including cost comparisons for replacement, re-designs and store closures, here.