Here’s another case study from our partners at intelli-force magnetix™ showing how quickly magnetic flooring can transform a space.
Problem: A 2,100 square foot cafeteria with a fully worn, vinyl asbestos tile floor. Looking at the costs of abatement, the management continued to push off replacing the floor for many years. The employees spent their breaks in a visually uncomfortable environment. This cafeteria is used by hundreds of employees and could not be shut down for any extended period.
The Solution: Installation of intelli-force magnetix™ beautiful LVT tile in a large plank format. The existing asbestos floor was isolated by our magnetically receptive floor coating and the new magnetic floor was installed in hours, not days. The employees were back in and were thrilled!